Power plants planned and retiring in Washington

3,601 MWWashington planned power plant capacity

Washington plans 3,601 MW, 12% of its 31,107 MW in service (32nd of 51). 355 MW is being built or tested; storage leads at 1,655 MW.

Washington: planned against running

Washington planned, by fuel

  • Solar 1,570 MW (44%)
  • Storage 1,655 MW (46%)
  • Wind 326 MW (9%)
  • Other 50 MW (1%)

Washington operating, by fuel

  • Solar 348 MW (1%)
  • Storage 318 MW (1%)
  • Wind 3,373 MW (11%)
  • Natural gas 3,385 MW (11%)
  • Coal 670 MW (2%)
  • Nuclear 1,151 MW (4%)
  • Hydro 21,569 MW (69%)
  • Oil 17 MW (0%)
  • Other 275 MW (1%)

When Washington capacity arrives and leaves

MW due online and retiring in Washington, 2026 to 2035: 6 rows
YearWashington planned MWWashington retiring MW
2026355No data
20276602
2028410No data
2029976No data
20311200No data
2035No data45

6 rows from EIA-860M.

CSV

Washington projects dated after 2035 or without a year: 0 MW.

Where the Washington projects are

Washington counties with planned power plants, darker for more MWYakimaAdamsKitsapBentonGrantGarfieldSnohomishChelanPierceThurstonKlickitat

Washington: 11 counties shaded, darker for more planned MW.

Filter Washington planned projects

Filter the 17 planned project lines in Washington.

3,601 MW across 17 project lines, 12% of the 31,107 MW operating in Washington.

  • Hop Hill Solar Generation and BESS, Benton: 500 MW solar, online 2031
  • Hop Hill Solar Generation and BESS, Benton: 500 MW storage, online 2031
  • Lower Snake Solar Generation BESS, Garfield: 300 MW solar, online 2029
  • Lower Snake Solar Generation BESS, Garfield: 300 MW storage, online 2029
  • Royal Slope, Grant: 260 MW storage, online 2027

What the Washington numbers say

Washington runs 31,107 MW today. The planned list would add 3,601 MW (12%) while 524 MW (2%) of operating units carry a retirement date. Through 2035, Washington has 3,601 MW due online and 47 MW due to retire there.

Washington planned mix: 99% solar, storage and wind, 0% natural gas. Washington stages: 355 MW under construction or in testing, 740 MW permits received, not started, 2,380 MW permits pending, 126 MW early planning, no approvals started. Washington retired 88 MW from 2021 to 2026 and has 604 MW on the canceled or postponed list.

Washington capacity by fuel and status

Washington capacity by fuel
Washington fuelOperating MWPlanned MWRetiring MWRetired MWCanceled in Washington, MW
Solar3481,570––190
Storage3181,655–2200
Wind3,373326––188
Natural gas3,385–5225–
Coal670––––
Nuclear1,151––––
Hydro21,569–2169
Oil17––––
Other27550–6517
All fuels31,1073,60152488604

Washington counties with the most planned capacity

Washington counties by planned MW
Washington countyPlanned, MWGeneratorsLargest fuel
Benton County1,2003Solar
Grant County6503Solar
Garfield County6002Solar
Klickitat County3002Solar
Pierce County2001Storage
Thurston County2001Storage
Kitsap County1701Storage
Adams County1261Wind
Yakima County801Solar
Chelan County501Other

Largest planned projects in Washington

Washington largest planned projects
Washington plantCountyFuelStageDueMW
Hop Hill Solar Generation and BESSBentonSolarPermits pending2031500
Hop Hill Solar Generation and BESSBentonStoragePermits pending2031500
Lower Snake Solar Generation BESSGarfieldSolarPermits pending2029300
Lower Snake Solar Generation BESSGarfieldStoragePermits pending2029300
Royal SlopeGrantStoragePermits received, not started2027260
Royal SlopeGrantSolarPermits received, not started2027260
Centralia Battery Energy Storage SystemThurstonStoragePermits pending2028200
Greenwater BESSPierceStorageUnder construction or in testing2026200
Hop Hill Solar Generation and BESSBentonWindPermits pending2031200
AGATE BESSKitsapStoragePermits pending2029170

Washington against its neighbors

Washington: planned MW equal 12% of operating. Bordering states: Idaho plans 15% of what it runs (3 points above Washington); Oregon plans 42% of what it runs (30 points above Washington).

Download

CSV by fuel CSV by project

Sources

EIA-860M inventory for Washington: 423 operating generators, 17 planned lines, edition August 2026, retrieved 5 Oct 2026. Sources for {e(sn)}.

More on Washington

Questions

Washington: how much new power plant capacity is planned?

3,601 MW, 12% of the 31,107 MW Washington runs. 355 MW is being built or tested in Washington.

Washington: what kind of power plants are planned?

Storage leads Washington with 1,655 of 3,601 planned MW.

Washington: which power plants are retiring?

524 MW of Washington units have a retirement date, of which 0 MW is coal and 522 MW natural gas.

Will Washington get all the planned plants?

Not necessarily. Washington has 604 MW canceled or postponed, and 88 MW (other the largest group) retired from 2021 to 2026.